Case Studies

Local Goverment

Role: Owners' Representative

​​Ongoing County Government Project

Recognizing early on that its location along major highway intersections would propel its region’s transition away from internal combustion engines (ICE) to electric vehicles (EV), one local government committed to achieving increased sustainability by deploying EVCI systems to meet the increased demand for EVs and reduce greenhouse gas (GHG) emissions.

As detailed in plans developed in 2012 and 2019, this county government is set to lead regional alternative fuel initiatives, encompassing:

Increased EVCI strategically located through a major interstate highway corridor.

Increased EVCI throughout the region.

A converted ICE-based fleet to EV-based fleet.

Added solar (PV) and battery energy storage (BESS) deployed strategically.

Scope:

0 +

Sites and growing. Including the nation’s first net-zero detention center

0

Level 2 chargers

0

Level 3 DCFC 50kW

0

Level 3 DCFC 150kW

0 +

Over 8 MW of PV

BESS

Provisioned to support power/load needs and TOU rate support as required

Turnkey EV Charging Solutions for Site Owners

Pre-qualify your site, apply now!

Learn more about

Our Successes

Grant
Applications

Pursued in excess of $10M through State and Federal grant applications.

Funding
Achievements

Successfully obtained an excess of $6M in funding awards.

Active
Projects

16 sites in 3 states are currently progressing through stages of funding, design, engineering, permiting, deployment, and activation.